Real Projects. Proven Results.
From concept to production, we build embedded systems that ship fast and hold up in the real world.
You bring the vision. We bring the engineering.

What We Do
Simple Innovations provides embedded engineering services from concept to production, including design, development, integration, productization, and long-term support.
Embedded Firmware Development
Lean, efficient firmware tuned to your exact hardware, built for reliability and long-term support.
Hardware Design & PCB Layout
From schematic to prototype, engineered for manufacturability from day one.
System Architecture & Integration
Hardware and firmware designed together by an experienced embedded systems engineer team, reducing risk, rework, and integration pain.
Productization & Support
Functional prototypes, manufacturing ramp support, and sustaining engineering services, so your product stays solid after launch.
…into a single unified process, executed by a team that owns your project from start to finish.
Result:
Your product works — reliably, repeatedly, and under real-world conditions.
A quick look at our process, reviews, and project rhythm.
Why We Exist
Our mission: To be the embedded experts product teams trust to get it right, delivering reliable systems, faster time-to-market, and products that hold up in the real world.
Hardware teams and firmware teams often operate in silos.
Integrations fail late in the process.
Schedules slip.
Technical debt piles up.
Products miss their deadlines — or worse — fail in the field.
What Makes Us Different (and why teams trust us with products that can’t fail)

Embedded Specialists
We focus where it matters most: embedded hardware, firmware, and embedded systems engineering. That depth means faster decisions, cleaner designs, and fewer surprises as you scale.
Embedded hardware • Embedded firmware • System integration
Deep experience. Practical execution.

Hardware + Firmware, Built Together
The most expensive problems show up at the seams. We design hardware and firmware as one system, integrating early so issues are found when fixes are cheap.
Our embedded engineering services support every stage of the build, including:
- Schematic + PCB design
- Bring-up + driver development
- Firmware + integration testing
- Design reviews
One team. One plan. Fewer handoffs.

Focused Engineering Pods
Your work doesn’t get lost in a queue. We staff a dedicated pod around your project, keeping momentum high and context-switching low.
Typical pod: Lead engineer, Supporting engineers (as needed)
Steady progress. Clear ownership.

Structured, Transparent, Metric-Driven Process
Every project includes:
- Defined milestones
- Sprint planning & weekly check-ins
- Tracking of timeline vs. hours vs. deliverables
- Full visibility into progress
You’ll never wonder:
“What’s being done?”
“How many hours are left?”
“Why are we behind schedule?”
You see what we see.

Long-Term Value Over Short-Term Savings
Our designs emphasize:
Reliability
Maintainability
Scalability
You pay less over the life of the product — even if we aren’t the lowest bidder at the start.
Because the most expensive engineering is the kind that needs to be redone.
Build It Right the First Time
How We Work
The habits and principles that keep projects predictable, collaborative, and built for fewer surprises:














15 minutes to a clear plan.
01
Pre-Proposal Alignment
- Requirements clarification
- Risk identification
- Timeline realism check
“Is this feasible?” becomes “Here’s the plan.”
02
Architecture & Planning
- System architecture
- Firmware architecture
- Component selection
- BOM sourcing / cost management
Save time by choosing the right parts and architecture early.
03
Engineering Execution (Sprints)
- Firmware development
- PCB design / layout
- Board bring-up
- Integration
Hardware and firmware tested together — not thrown over the wall.
04
Prototype & Test
- Power testing
- Environmental testing
- Edge-case handling
- EMI preparation (if applicable)
Reduce prototype spins from 4… to 1.
05
Production & Support
- Manufacturing support
- Compliance documentation
- Firmware updates & sustaining engineering
Your product works in the field — not just on PowerPoint.
Talk with an engineer about your product
Engineering Experience Across Multiple Industries
Because embedded systems touch the real world, industries matter. We specialize in:
Medical Devices
- Compliance & documentation support
- Low risk / high reliability development
- Compliance & documentation support
Industrial Automation & Manufacturing Equipment
- Motor control firmware
- Sensor-heavy systems
- Long lifecycle support
- Motor control firmware
Consumer & IoT Product Development
- Connected product architecture
- Power optimization (battery life)
- Cloud / mobile integration support (via partner APIs)
- Connected product architecture
FAQ's
What services does Simple Innovations offer?
We offer embedded engineering, firmware development, PCB design, and electronics product development.
Do you provide end-to-end product development?
Yes, from concept to production and support.
What industries do you serve?
IoT, industrial, aerospace, medical, and consumer electronics.
Do you handle hardware and software integration?
Yes, we specialize in complete system integration.
Why choose Simple Innovations?
We deliver reliable, scalable, and high-performance engineering solutions.
Real Results. Real Products. Built With Us.
PROJECT
Medical device sensor platform
IoT power controller
Wireless control board
RESULT
Passed regulatory submission on first
Reduced PCB prototype spins 4 → 1
Doubled battery life via firmware optimization
Let’s talk through your project. No sales pitch — just engineering conversation.
“I don't know what we did before discovering Strada. Every project is a masterpiece!”
James London, CEO @ Freshee
“Amazing service. Can’t wait to find out what’s next!”
James London, CEO @ Media Knows
“I don't know what we did before discovering Strada. Every project is a masterpiece!”
James London, CEO @ Freshee
“Amazing service. Can’t wait to find out what’s next!”
James London, CEO @ Media Knows


